News & Reports

Generator removal P2

Generators G4 and G5 located in P2 had to removed and shipped to a Toronto based company  to be dried out and tested.  This will identify any damages from the March 29th lower Bonnechere landslide flooding we experienced.

Posted in news

Lower Bonnechere River Blockage March 29 2016

Posted in news

First American Eel

RPG captured its first American Eel on September 24th.  It was 25.8cm long and had a weight of a hefty .06lbs.  The eel trapping program has been ongoing in conjunction with MNRF Pembroke.  The eel was released back into the Bonnechere River.

Posted in news

Thomas Low Generating Station Officially Opens

RENFREW, ON, September 25, 2015 Renfrew Power Generation’s (RPG) new Thomas Low Generating Station, officially opened today by Ontario’s Energy Minister Bob Chiarelli, doubles RPG’s power generation capacity, reduces greenhouse gas emissions, and provides long term dividends to the Town of Renfrew. The construction of the Thomas Low Generating Station and the renewal of the […]

Posted in News

The Swinging Bridge is now open!

The Swinging Bridge is now open! Thank you for your patience. Renfrew Power Generation (RPG) extends a thank you to those who experienced delays in traffic, to our neighbours who lived with us through construction, and pedestrians who missed making the trek across the Town of Renfrew’s historic Swinging Bridge—which is now open. You can […]

Posted in News

Media Releases and Advisories

Reports: Environmental Assessment