Generators G4 and G5 located in P2 had to removed and shipped to a Toronto based company to be dried out and tested. This will identify any damages from the March 29th lower Bonnechere landslide flooding we experienced.
You are browsing archives for
Category: news
Lower Bonnechere River Blockage March 29...
First American Eel
RPG captured its first American Eel on September 24th. It was 25.8cm long and had a weight of a hefty .06lbs. The eel trapping program has been ongoing in conjunction with MNRF Pembroke. The eel was released back into the Bonnechere River.